This Department is generally responsible for exercising regulatory control through assessment and licensing in areas related to nuclear safety in accordance with the Law (as amended), its Executive Regulations, regulations and all other rules and decrees to ensure the safety and protection of humans, property and the environment from the harmful effects of ionizing radiation.
2025
Dabaa Site ( NPPA )
Date : 6 / 4/ 2025
Observation : Inspection findings were identified as areas for improvement with no significant effect on safety
Date : 12 / 11/ 2025
Observation :Target inspection has been conducted for installation of Reactor pressure vessel of unit 1
Observation :Inspection findings were identified as areas for improvement with no significant effect on safety.
Observation :The objectives of the inspection in accordance with Inspection Plan were achieved. Regulatory requirements for the construction are generally fulfilled. No significant effect on safety.
Observation :The objectives of the inspection in accordance with Inspection Plan were achieved. Regulatory requirements for the construction are generally fulfilled. No significant effect on safety.
Observation :Daily inspection at the DNPP site cover the oversight on construction activities .
Observation :Oversight manufacturing activities in the factory sites at foreign countries during conformity assessment of SSCs.
Atomic Energy Authority ( AEA )
Observation : Compliance with legislation and regulatory requirements for extended shutdown status was verified. No significant effect on safety.
Date : 22 / 4 /2025
Observation :The scope of this inspection includes operation and operation procedures, maintenance, radioactive waste management, radiation protection, fire system, management system, training, qualification, emergency preparedness, occupational and industrial safety and follow up the previous inspection findings. No significant effect on safety
DATE : 13 / 10 / 2025
Observation : The objective of inspection was to follow up the licensee implementation of corrective actions action plans. No significant effect on safety
Date : 21 / 5 /2025
Observation :The scope of this inspection includes operation and operation procedures, maintenance, radioactive waste management, radiation protection, fire system, management system, training, qualification, emergency preparedness, occupational and industrial safety and follow up the previous inspection findings. No significant effect on safety
Date : 3/ 11 /2025
Observation :The objective of inspection was to follow up the licensee implementation of corrective actions action plans. No significant effect on safety
Observation : the possibility of granting a construction permit for UPPP is confirmed the scope of the inspection includes the assurance of compliance with the quality management requirements. No significant effect on safety
2024
Dabaa Site ( NPPA )
Observation :Inspection covers documentation management; the state of the facility and permitted activities wit the design, engineering and process documentation; quality control in relation to the construction activities; integrated management system; personnel qualifications and performance; performance of permitted activities; conformity assessment of SSCs. No significant effect on safety.
Observation :Inspection findings were identified as areas for improvement with no significant effect on safety.
Observation :The objectives of the inspection in accordance with Inspection Plan were achieved. Regulatory requirements for the construction are generally fulfilled. No significant effect on safety
Observation :The objectives of the inspection in accordance with Inspection Plan were achieved. Regulatory requirements for the construction are generally fulfilled. No significant effect on safety.
Observation :The objectives of the inspection in accordance with Inspection Plan were achieved. Regulatory requirements for the construction are generally fulfilled. No significant effect on safety.
Observation :Daily inspection at the DNPP site cover the oversight on construction activities
Observation : The inspection covers previous experience in manufacturing similar components; organizational aspects including personnel qualifications and assessment; quality management system and relevant procedures and practices; knowledge about the regulatory requirements; process equipment, testing devices, laboratory appliances and tools, devices and instrumentations; metrological support of the production; steps of launching the equipment into production; arrangement of destructive and non-destructive tests; calibration of applied tools and devices; fire safety. It was found that the factories are ready to manufacture SSCs important to safety (class 2 & 3)
Observation :Oversight manufacturing activities in the factory sites at foreign countries during conformity assessment of SSCs.
Atomic Energy Authority ( AEA )
Observation :Current status under extended shutdown, water chemistry management, waste management, radiation protection, emergency preparedness, maintenance activities, fire system and industrial safety were verified. No significant effect on safety.
Date : 29 / 5 /2024
Observation :The purpose of the inspection is to verify the compliance of the operation activities and the performance of the safety systems and equipment with the regulatory requirements, conditions, standards, and approved procedures. No significant effect on safety.
DATE : 3/ 12 / 2024
Observation :The inspection includes operation and operation procedures; maintenance; radioactive waste management; radiation protection; fire system; occupational and industrial safety; management system; training and qualifications. No significant effect on safety. No significant effect on safety.
Date : 15/ 5 /2024
Observation :
The inspection covered the following areas: Operation safety &Manufacturing procedures, Maintenance and test activities, Radioactive waste management, Radiation protection measures, Fire system, Occupational health and safety, Management system, training, qualification, Emergency preparedness and response. No significant effect on safety
Date : 18 /11 /2024
Observation : The objective of inspection was to verify that FMPP operational activities are conducted in compliance with legislation, regulatory requirements and follow up the implementation of corrective actions. No significant effect on safety.